

The following development-specific guide is currently available in Traditional Chinese.
資料整理:2026-10-23 · 非驗樓案例報告
上然第二期的驗樓應依照第二期文件準備,不能直接套用第一期的交付設備或通知日期。本頁聚焦第二期準業主如何由文件準備銜接現場檢查。
把第二期的單位平面圖、裝置設備表及其後正式修訂分開保存。列出房間、廚浴及室外空間(如適用)的交付項目,待收到個別單位通知後再確認驗樓日,避免只根據其他期數的消息預約。
如果交付時某設備未能啟動,或現場不允許某項測試,請記錄原因及後續安排。門窗開關、去水及設備功能應按實際可用條件檢查;限制項目不可當成已完成檢驗。
資料及日期可能更新,請以最新正式文件及個別收樓通知為準。一般檢查建議不表示該樓盤存在相關缺陷。
如果您正準備收取LE MONT PHASE 2單位,可先了解獨立第三方驗樓的流程。 在獲准進場後檢驗單位,將發現的瑕疵記錄在案,再按適用程序向發展商提交執漏清單。交收及呈報期限以合約和正式通知為準。
We have no vested interest in any developer or property agent, so our reports are independent and objective, with transparent, upfront pricing $4.5/sq. ft. saleable area, and a detailed PDF inspection report is included free of charge.
收到通知後,先核對買賣合約及通知書列明的交收期限、入場要求與執漏呈報安排,再盡早預約驗樓。不同項目及單位的安排可能不同。
Provide the estate name and saleable area for an instant, clear quotation. Once a date is set, we arrive at the unit on time for the inspection.
From the entrance, walls and floors, doors and windows, kitchen, bathroom, and balcony to electrical and mechanical installations — everything is checked item by item, with every defect photographed and annotated.
A detailed PDF inspection report included free of charge, ready to hand directly to the developer for defect rectification.
執漏完成後,可安排複驗核對修復情況。交收、簽署文件及執漏的安排應按合約與通知處理;如涉及交收權利或期限,請向律師確認。
Tap testing for hollow tiles, plaster flatness, cracks, and floor level measurement
Infrared thermal imaging and microwave moisture meters detect hidden dampness and check drainage flow
Socket polarity and earthing tests, distribution board labelling, and light switch checks
Smooth operation of main doors, room doors and windows, smoke seals, window hinges, and rubber gaskets
Every defect is photographed and annotated, clearly indicating its location and severity
Report issued within 1 working day, included free of charge, and ready to submit directly to the developer for rectification
Charged by saleable area — transparent pricing with no hidden fees
Book as soon as you receive the developer's handover notice. The earlier the inspection, the more time the developer has for rectification, which typically takes 2 to 6 weeks.
It depends on the unit size. Units under 500 sq. ft. generally take 2 to 3 hours. We inspect every spot carefully and never rush.
A detailed PDF report with annotated photos is issued within 1 working day of the inspection, free of charge, ready to pass directly to the developer for rectification.
You don't need to be present the whole time, but we recommend coming at the end of the inspection to hear the inspector explain the key issues, making follow-up with the developer easier.
Tell us your estate name and saleable area for an instant quote.